引用本文: | 刘礼邦,武传涛,随权,等.计及可控负荷参与的主动配电网动态恢复供电策略[J].电力系统保护与控制,2020,48(9):27-35.[点击复制] |
LIU Libang,WU Chuantao,SUI Quan,et al.Power supply strategy for active distribution network dynamic recovery with controllable load participation[J].Power System Protection and Control,2020,48(9):27-35[点击复制] |
|
摘要: |
针对传统基于单时间断面的恢复供电策略难以长时间保持负荷恢复期间的电气孤岛稳定运行问题,提出了一种主动配网多时段动态恢复供电策略。通过引入可控负荷,提高了电网重建的效率和恢复期间负荷的运行稳定性。此外,针对主动配电网负荷动态恢复模型变量过多、难以求解的问题,提出一种启发式孤岛动态调整算法。仿真结果验证了所提策略的可行性和优越性。 |
关键词: 主动配电网 可控负荷 动态供电恢复 孤岛划分 |
DOI:10.19783/j.cnki.pspc.191071 |
投稿时间:2019-09-03修订日期:2020-01-05 |
基金项目:国家自然科学基金重点项目资助(51537003) |
|
Power supply strategy for active distribution network dynamic recovery with controllable load participation |
LIU Libang,WU Chuantao,SUI Quan,CHEN Chong,LIN Xiangning,LI Zhengtian |
(College of Electrical Engineering and New Energy, Three Gorges University, Yichang 443002, China;State Key Laboratory of Advanced Electromagnetic Engineering and Technology Huazhong University of Science and Technology, Wuhan 430074, China) |
Abstract: |
A multi-period dynamic power supply recovery strategy for active power distribution is proposed. This is to tackle the problem that the traditional power recovery strategy based on a single-time section finds it difficult to maintain the stable operation of electrical islands for a long time during load recovery. The efficiency of grid reconstruction and the stability of load operation during recovery are improved by introducing controllable loads. In addition, a heuristic island dynamic adjustment algorithm is proposed for the problem that the active distribution network load dynamic recovery model has too many variables and is difficult to solve. Simulation results verify the feasibility and superiority of the proposed strategy. This work is supported by Key Program of National Natural Science Foundation of China (No. 51537003). |
Key words: active distribution network controllable load dynamic power recovery island partition |