引用本文: | 杨 楠,丁 力,刘 钊,等.市场背景下考虑不确定性价值和全市场要素博弈的
电力系统规划方法[J].电力系统保护与控制,2022,50(9):11-23.[点击复制] |
YANG Nan,DING Li,LIU Zhao,et al.Power system planning method considering uncertainty value and entire market elementgame under market background[J].Power System Protection and Control,2022,50(9):11-23[点击复制] |
|
本文已被:浏览 5066次 下载 1126次 |
码上扫一扫! |
市场背景下考虑不确定性价值和全市场要素博弈的
电力系统规划方法 |
杨楠,丁力,刘钊,鄢晶,邢超,邾玢鑫,黄悦华,张谢天,任羽纶 |
|
((1.三峡大学智慧能源技术湖北省工程研究中心,湖北 宜昌 443002;2.国网江西省电力有限公司鹰潭供电分公司,
江西 鹰潭 335000;3.国网湖北省电力有限公司,湖北 武汉 440000;4.云南电网有限责任公司电力科学
研究院,云南 昆明 650217;5.国网湖北省电力有限公司经济技术研究院,湖北 武汉 440000)) |
|
摘要: |
电力市场化改革的深化为电力系统规划领域引入了新的问题。为应对这一变化,提出了一种市场背景下考虑规划不确定性价值和全市场要素博弈的电力系统规划方法。首先,在分析电力市场各参与者的整体利益诉求的基础上引入特殊主体独立系统运营商(Independent System Operator, ISO),并从市场运营角度构建输电公司规划模型。然后,在RO(Real Option)理论的基础上,以发电机组选址定容、输电线路扩容和分布式电源(Distributed Generation, DG)投运为决策变量,并同时分析各市场参与者之间的博弈交互机理,构建基于RO理论的多主体博弈规划模型。基于IEEE30系统的仿真算例验证了所提方法的有效性和正确性。 |
关键词: 电力市场 多主体博弈 实物期权理论 电力系统规划 |
DOI:DOI: 10.19783/j.cnki.pspc.211017 |
投稿时间:2021-08-03修订日期:2021-10-13 |
基金项目:国家自然科学基金项目资助(51607104) |
|
Power system planning method considering uncertainty value and entire market elementgame under market background |
YANG Nan,DING Li,LIU Zhao,YAN Jing,XING Chao,ZHU Binxin,HUANG Yuehua,ZHANG Xietian,REN Yunlun |
(1. Hubei Provincial Engineering Research Center of Intelligent Energy Technology, China Three Gorges University, Yichang
443002, China; 2. Yingtan Power Supply Branch, State Grid Jiangxi Electric Power Co., Ltd., Yingtan 335000, China;
3. State Grid Hubei Electric Power Co., Ltd., Wuhan 440000, China; 4. Electric Power Research Institute, Yunnan
Power Grid Co., Ltd, Kunming 650217, China; 5. Economy & Technology Research Institute,
State Grid Hubei Electric Power Co., Ltd., Wuhan 440000, China) |
Abstract: |
The deepening of power market reform has introduced new problems to the field of power system planning. To cope with this change, a power system planning method considering the uncertainty value of planning and the game of entire market factors under a market background is proposed. First, an independent system operator (ISO) is introduced based on the analysis of the overall interests of participants in the power market, and the planning model of transmission companies is constructed from the perspective of market operation. Then, the location and capacity of the generator set, transmission line expansion, and distributed generation (DG) operation are taken as decision variables, and the game interaction mechanism between market participants is analyzed. A multi-agent game planning model based on RO theory is constructed. Simulation results based on the IEEE30 system verify the effectiveness and correctness of the proposed method.
This work is supported by the National Natural Science Foundation of China (No. 51607104). |
Key words: electricity market multi-agent game real options power system planning |