• Home
  • Information
  • Editorial Board
  • Submission Guidelines
  • Template for PCMP
  • Ethics & Disclosures
Citation:Qian Ai,Songli Fan,Longjian Piao.Optimal scheduling strategy for virtualpower plants based on credibility theory[J].Protection and Control of Modern Power Systems,2016,V1(1):48-55[Copy]
Print       PDF       View/Add Comment      Download reader       Close
←Prev|Next→ Archive    Advanced Search
Click: 1878   Download: 926 本文二维码信息
Optimal scheduling strategy for virtualpower plants based on credibility theory
Qian Ai,Songli Fan,Longjian Piao
Font:+|Default|-
Abstract:
The virtual power plant (VPP) is a new and efficient solution to manage the integration of distributed energy resources (DERs) into the power system. Considering the unpredictable output of stochastic DERs, conventional scheduling strategies always set plenty of reserve aside in order to guarantee the reliability of operation, which is too conservative to gain more benefits. Thus, it is significant to research the scheduling strategies of VPPs, which can coordinate the risks and benefits of VPP operation. This paper presents a fuzzy chance-constrained scheduling model which utilizes fuzzy variables to describe uncertain features of distributed generators (DGs). Based on credibility theory, the concept of the confidence level is introduced to quantify the feasibility of the conditions, which reflects the risk tolerance of VPP operation. By transforming the fuzzy chance constraints into their equivalent forms, traditional optimization algorithms can be used to solve the optimal scheduling problem. An IEEE 6-node system is employed to prove the feasibility of the proposed scheduling model. Case studies demonstrate that the fuzzy chance strategy is superior to conservative scheduling strategies in realizing the right balance between risks and benefits.
Key words:  Credibility theory, Distributed energy resource (DER), Scheduling strategy, Uncertain factors, Virtual powerplant (VPP)
DOI:10.1186/s41601-016-0017-x
Fund:
Protection and Control of Modern Power Systems
Add: No. 17 Shangde Road, Xuchang 461000, Henan Province, P. R. China
E-mail: pcmp@vip.126.com     Tel: 0374-3212254/2234
  copyright Power Kingdom 2022.豫ICP备17035427号-1