• Home
  • Information
  • Editorial Board
  • Submission Guidelines
  • Template for PCMP
  • Ethics & Disclosures
Citation:Dejin Fan,Shu Zhang,He Huang,et al.Three-stage day-ahead scheduling strategy for regional thermostatically controlled load aggregators[J].Protection and Control of Modern Power Systems,2023,V8(2):321-331[Copy]
Print       PDF       View/Add Comment      Download reader       Close
←Prev|Next→ Archive    Advanced Search
Click: 1682   Download: 937 本文二维码信息
Three-stage day-ahead scheduling strategy for regional thermostatically controlled load aggregators
Dejin Fan,Shu Zhang,He Huang,Liping Zhou,Yang Wang,Xianyong Xiao
Font:+|Default|-
Abstract:
Thermostatically controlled loads (TCLs) are regarded as having potential to participate in power grid regulation. This paper proposes a scheduling strategy with three-stage optimization for regional aggregators jointly participating in day-ahead scheduling to support demand response. The first stage is on the profit of aggregators and peak load of the grid. The line loss and voltage deviation of regulation are considered to ensure stable operation of the power grid at the second stage, which guarantees the fairness of the regulation and the comfort of users. A single temperature adjustment strategy is used to control TCLs to maximize the response potential in the third stage. Finally, digital simulation based on the IEEE 33-bus distribution network system proves that the proposed three-stage scheduling strategy can keep the voltage deviation within ± 5% in different situations. In addition, the Gini coefficient of distribution increases by 20% and the predicted percentage of dissatisfied is 48% lower than those without distribution.
Key words:  Demand response, Thermostatically controlled loads, Three-stages scheduling strategy, Regional aggregators, PPD, Gini coefficient
DOI:10.1186/s41601-023-00295-w
Fund:This work was supported in part by the National Natural Science Foundation of China (No. 52007126 and No. U2166209).
Protection and Control of Modern Power Systems
Add: No. 17 Shangde Road, Xuchang 461000, Henan Province, P. R. China
E-mail: pcmp@vip.126.com     Tel: 0374-3212254/2234
  copyright Power Kingdom 2022.豫ICP备17035427号-1